Open RFP

Beaver Ruin Diversion Pump Station Grinders Replacement Project

Description: Project includes the following Work: 1) Replacement and installation of the three (3) existing grinder units with new rail systems, channel modifications, and control panels. 2) Replacement and installation of the three (3) existing influent slide gates with actuators. 3) Replacement and installation of the three (3) existing effluent slide gates. 4) Replacement and installation of the two (2) existing influent wet well slide gates. 5) Replacement and installation of one (1) existing wet well crossover slide gate. 6) Raising of concrete wet well baffle wall and platform elevations. 7) Relocation and re-installation of existing flushing system. 8) Installation of electrical conduit and designed routing with MCC configuration.

Buyer
Gwinnett County

County · GA, US

Released
Aug 12, 2026
Closes
Sep 23, 2026(37 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts