Mascoutah Community School District 19
School DistrictIL
Posted
-
Oct 8, 2026
25-4307.02 Classroom Addition & Renovation Scott Elementary School - Mascoutah SD 19
Classroom addition & renovation Scott Elementary School.
Description: Elementary School: The scope of work for the Alterations at Elementary School includes but is not limited to: Alterations to convert an existing Library into multiple Classrooms including all new finishes, wall partitions, electrical power & lighting, suspended acoustic tile ceilings, and modifications & upgrades to the existing HVAC system. Work also includes the installation of a wall with door access for the existing nurse's suite, a renovation of the existing cafeteria kitchen and pantry, and addition of a new office within the existing music room. The scope also includes the new construction of a two story media center and classroom addition. The addition includes a 2-story exterior stair. The addition will be freestanding and attached to the building through a connecting corridor on both stories with floor, wall and roof expansion joints. The exterior envelope will closely match the existing facade materiality of brick and will include the use of metal panels, and glass curtain wall. Gym: The Hopkins Gym parcel is a new gymnasium building to be built on the existing High School lot. This new construction will be an A-3 assembly occupancy. This building will be constructed as slab-on-grade with concrete and block foundations and footings. The exterior envelope will feature brick masonry, cast-stone details, and translucent daylighting sandwich panels. Bearing CMU and steel columns will support the steel joist roof, metal deck, and partial modified bitumen roof/partial standing seam metal roof over continuous insulation. The construction type will be II-B and the full building will be sprinklered. The program of this building includes a high school basketball gym, a wrestling gym with an office, locker rooms, trainer’s room, toilet rooms, shower room, electrical and plumbing room, and a couple of storage rooms. The site work on this cleared and developed site will include a parking lot that will serve the new gym, site lighting, and landscaping.
SchoolDistrict · NJ, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Haddonfield Public Schools.
These related opportunities are still open for bidding.
Mascoutah Community School District 19
School DistrictIL
Posted
-
Oct 8, 2026
Classroom addition & renovation Scott Elementary School.
Madison County School District
School DistrictAL
Posted
Aug 26, 2026
Sep 24, 2026
Riverton elementary school classroom addition.
School DistrictNJ
Posted
-
Oct 1, 2026
New gymnasium building at Somerville high school including full size gymnasium, bleachers, athletic training, weight room, and locker rooms (with team rooms).
School DistrictAL
Posted
Sep 12, 2026
Sep 24, 2026
Site work, new single-level, concrete block wall construction, with brick veneer, aluminum window, TPO membrane roof on composite deck system, structural metal frame, interior concrete block wall and paint finish, wood gymnasium floor and wall finishes, plus plumbing, mechanical, and electrical work as required.