School DistrictNJ
Posted
-
Oct 1, 2026
New Gymnasium Building At Somerville High School
New gymnasium building at Somerville high school including full size gymnasium, bleachers, athletic training, weight room, and locker rooms (with team rooms).
Description: Site work, new single-level, concrete block wall construction, with brick veneer, aluminum window, TPO membrane roof on composite deck system, structural metal frame, interior concrete block wall and paint finish, wood gymnasium floor and wall finishes, plus plumbing, mechanical, and electrical work as required.
SchoolDistrict · AL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
School DistrictNJ
Posted
-
Oct 1, 2026
New gymnasium building at Somerville high school including full size gymnasium, bleachers, athletic training, weight room, and locker rooms (with team rooms).
School DistrictOK
Posted
Sep 9, 2026
Oct 1, 2026
Gymnasium Renovation. Bid packages to include: 3A- Concrete; 5A- Railings; 6A- Millwork; 8A- Storefront; 8B- Hollow Metal; 8C- Wood Doors; 8D- Hardware; 8F- Coiling Doors; 9A- Drywall; 9B- Painting; 9C- Floor coverings; 13A- Bleacher Seating; 15A- Plumbing; 15B- HVAC; 16A- Electrical; 32A- Tennis Court Resurface.
School DistrictMO
Posted
Sep 16, 2026
Oct 6, 2026
Provide gymnasium floor replacement.
Pardons and Paroles Calera Field Office
State AgencyAL
Posted
Sep 16, 2026
Sep 25, 2026
Provide janitorial service.
Decision makers connected to this RFP from Shelby County School District.