New Gymnasium for Calera High School RFP
Posted
Sep 12, 2026
Sep 24, 2026
Site work, new single-level, concrete block wall construction, with brick veneer, aluminum window, TPO membrane roof on composite deck system, structural metal frame, interior concrete block wall and paint finish, wood gymnasium floor and wall finishes, plus plumbing, mechanical, and electrical work as required.
