Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes rehabilitation and construction of bridges, docks, and boat ramps.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The contract involves supplying and delivering boat docks for Lower Fremont Lake in Sublette County, Wyoming. It is issued by the Wyoming State Construction Department, Procurement Section on behalf of the Wyoming Game & Fish Department. Bids must be submitted through the Public Purchase system by January 21, 2026.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
The contract involves supplying and delivering boat docks for Lower Fremont Lake in Sublette County, Wyoming. It is issued by the Wyoming State Construction Department, Procurement Section on behalf of the Wyoming Game & Fish Department. Bids must be submitted through the Public Purchase system by January 21, 2026.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide architectural & engineering continuing contract services.
Posted Date
Dec 21, 2025
Due Date
Jan 27, 2026
Release: Dec 21, 2025
Close: Jan 27, 2026
Provide architectural & engineering continuing contract services.
AvailableThe University of Central Florida is soliciting qualified contractors to provide corrective, predictive, and preventive maintenance services for campus wastewater collection systems, including SCADA, pumps, motors, lift stations, and related process water collection systems. The solicitation seeks multiple contractors under an open-ended (multiple-award) continuing services contract for one year with four annual renewal options; selected firms must meet bonding capacity requirements ($2,000,000 minimum; $7,500,000 maximum). The work covers campus utility generation assets and affiliated properties; responses require a letter of interest and past performance documentation.
Posted Date
Dec 12, 2025
Due Date
Jan 12, 2026
Release: Dec 12, 2025
Close: Jan 12, 2026
The University of Central Florida is soliciting qualified contractors to provide corrective, predictive, and preventive maintenance services for campus wastewater collection systems, including SCADA, pumps, motors, lift stations, and related process water collection systems. The solicitation seeks multiple contractors under an open-ended (multiple-award) continuing services contract for one year with four annual renewal options; selected firms must meet bonding capacity requirements ($2,000,000 minimum; $7,500,000 maximum). The work covers campus utility generation assets and affiliated properties; responses require a letter of interest and past performance documentation.
AvailableDESIGN-BUILD - This is a partial design build roadway project. Design activities are limited to: concrete curb ramps, temporary curb ramps, concrete bike ramps. For the construction of a roundabout, drainage upgrades, curb and sidewalk replacement, highway lighting upgrades, signing, pavement markings, milling and resurfacing, and other miscellaneous construction.
Posted Date
Dec 8, 2025
Due Date
Jan 8, 2026
Release: Dec 8, 2025
Close: Jan 8, 2026
DESIGN-BUILD - This is a partial design build roadway project. Design activities are limited to: concrete curb ramps, temporary curb ramps, concrete bike ramps. For the construction of a roundabout, drainage upgrades, curb and sidewalk replacement, highway lighting upgrades, signing, pavement markings, milling and resurfacing, and other miscellaneous construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →