Construction of Water Plant No. 1 Chloramine Conversion and Surface Water Tie-In
Description: Castlewood Municipal Utility District seeks construction of a chloramine-conversion and surface-water tie-in project at Water Plant No. 1. Work includes constructing a CMU block building for chemical equipment and installing gaseous chlorine and liquid ammonium sulfate systems, with storage, containment, feed equipment, piping, and injection quills. The project also includes plant piping and electrical and control work, analysis equipment and a mixer, site grading and drainage, coatings, disinfection, testing, restoration, hydromulch seeding, and stormwater-pollution-prevention measures.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
The City of Chicago Department of Water Management is soliciting bids to rehabilitate surface infrastructure and protect underlying water treatment facilities at the Jardine Water Purification Plant. This is a construction procurement, not a grant program. A pre-bid conference is scheduled for October 30, 2026, at 10:00 a.m. Central Time.
10,000 SF preparation and repair of top of concrete slabs; 3,000 SF full-depth of concrete slabs; 7,000 SF bottom of concrete slabs; 1,000 SF beam vertical faces; 10,000 SF sidewalk.
Cornerstones Municipal Utility District is soliciting bids for rehabilitation of Water Plant No. 1, solicitation 2259-009-01, C1. Work includes overcoating and recoating storage tanks and plant piping, installing surface-water inlet piping and cathodic protection, replacing vents and fall-arrest systems, and rehabilitating the CMU building. Bids are due November 13, 2026 at 11:00 a.m. CST through Civcast; a nonmandatory pre-bid meeting is scheduled for November 6.
The City of Fairhope is requesting responses from qualified contractors to provide all materials, labor, equipment, and incidentals required for preparation and construction of reinforced slab, electrical, plumbing, and other necessary appurtenances for one new lime slurry treatment system at Fairhope Public Utilities Water Treatment Plant #1.
Publication Date/Time: 10/29/2026 5:00 AM
Closing Date/Time: 11/10/2026 2:00 PM
Submittal Information: Sealed Bids must be received at City of Fairhope, 555 S. Section St., Fairhope, AL
Pre-bid Meeting: 10/27/2026
Contact Person: Procurement and Contracts Manager: Erin Wolfe
Download Available: Yes
Plan & Spec Available: See attached Document
Business Hours: 8:00 a.m. to 4:00 p.m.
Special Requirements: MANDATORY Pre-Bid Meeting: 10/27/26 at 10:00 a.m. at Fairhope City Services and Utility Building, 555 South Section Street, Fairhope, AL 36532
Related Documents: Bid 27-006-2026-WAT-011 WTP 1 Lime Slurry System (plans/specifications available)
RFP documents & timeline
From the first pre-RFP signals to the published RFP and its files.
Board meeting
The Board authorized Quiddity to advertise the Water Plant No. 1 Chloramine Conversion and Surface Water Tie-In project for bids.
See sourceHide source
Ms. Lyndsay Evans reviewed the Engineer's Report, a copy of which is attached hereto as an exhibit. Ms. Evans first discussed the Water Plant No. I Chloramine Conversion & Surface Water Tie- In project noting Quiddity has submitted construction plans to all external agencies and requested authorization to advertise for bids. Ms. Evans then reported on the…
Castlewood Municipal Utility District Minutes Of Meeting
The Board discussed a bond issue likely within the next year and Quiddity’s preparation of a bond application to fund construction including a surface-water tie-in.
See sourceHide source
2026 TAX RATE RECOMMENDATION Mr. Craig Rathmann reviewed the District's certified tax rolls for the 2026 tax year and the Financial Advisor's 2026 tax rate recommendation. Mr. Rathmann noted certified values for the District increased very slightly $367,101,870 in 2025 to $368,802,892 in 2026. He reported that based on the District's 2026 certified assessed…
Castlewood Municipal Utility District Minutes Of Meeting
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.