Construction of Water Plant No. 1 Chloramine Conversion and Surface Water Tie-In
Posted
-
Nov 5, 2026
Castlewood Municipal Utility District seeks construction of a chloramine-conversion and surface-water tie-in project at Water Plant No. 1. Work includes constructing a CMU block building for chemical equipment and installing gaseous chlorine and liquid ammonium sulfate systems, with storage, containment, feed equipment, piping, and injection quills. The project also includes plant piping and electrical and control work, analysis equipment and a mixer, site grading and drainage, coatings, disinfection, testing, restoration, hydromulch seeding, and stormwater-pollution-prevention measures.



