Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project will include construction of a new treatment building, a new arsenic treatment system; construction of water lines and connections to the existing well house piping; construction of concrete drying beds and an unlined infiltration basin; and installation of electrical equipment and controls upgrades.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Dec 25, 2025
Close: Jan 22, 2026
PFA treatment at well no. 5-2A.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construction services for well no. 3 at water treatment facility #2.
Posted Date
Dec 29, 2025
Due Date
Jan 30, 2026
Release: Dec 29, 2025
Close: Jan 30, 2026
Provide construction services for well no. 3 at water treatment facility #2.
AvailableThe City of Surprise Water Resource Management department is soliciting Statements of Qualifications (SOQs) from qualified engineering firms to design the Rancho Gabriella Water Supply Facility Expansion, including expansion of arsenic treatment and design of a third above-ground storage tank. Deliverables include full design documents (30/60/90/100% packages), cost estimates, permitting support, system study and coordination with regulatory agencies and stakeholders. The project aims to increase treatment capacity and ensure compliance and operational sustainability to meet current and future potable water demands.
Posted Date
Dec 11, 2025
Due Date
Jan 22, 2026
Release: Dec 11, 2025
Close: Jan 22, 2026
The City of Surprise Water Resource Management department is soliciting Statements of Qualifications (SOQs) from qualified engineering firms to design the Rancho Gabriella Water Supply Facility Expansion, including expansion of arsenic treatment and design of a third above-ground storage tank. Deliverables include full design documents (30/60/90/100% packages), cost estimates, permitting support, system study and coordination with regulatory agencies and stakeholders. The project aims to increase treatment capacity and ensure compliance and operational sustainability to meet current and future potable water demands.
The City of Mount Dora is seeking qualified contractors to provide construction services for the installation of a new Well No. 3 at Water Treatment Facility #2.
Posted Date
Dec 29, 2025
Due Date
Jan 30, 2026
Release: Dec 29, 2025
Close: Jan 30, 2026
The City of Mount Dora is seeking qualified contractors to provide construction services for the installation of a new Well No. 3 at Water Treatment Facility #2.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →