San Joaquin Regional Rail Commission
Work consist of 6 EA of remove plastic bollards at existing speed bumps, 117 EA of remove wheel-stops, 1 CY of remove existing landscaping curb, 482 LF of remove curb, 56 LF of remove curb and gutter, 1 EA of remove asphalt concrete at curb removal, 415 sf of remove concrete sidewalk and curb ramp, 75 LF of remove existing conduit and wiring, 539 LF of concrete curb and gutter, 532 SF of concrete sidewalk and curb ramp. See outside link.
Release
Sep 30, 2024
Close
Oct 30, 2024