Special DistrictNJ
Aug 12, 2026
Closes
Sep 1, 2026
Replacement of Hot Water Heaters and Storage Tanks At Various Sites RFP
Replacement of hot water heaters and storage tanks at various sites.
Description: The work consists of the installation of a solar powered mixing system to evenly distribute water in the water storage tank. The water storage tank is a one-million-gallon welded steel standpipe located in the high service system pressure zone with access off. Add alternate no. 1 consists of the installation of a solar powered mixing system within the water storage tank. The water storage tank is a two-million-gallon steel tank located in the high service system pressure zone with access off of sycamore drive.
City · MA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Town of Holden.
Adjacent opportunities open for bidding right now.
Special DistrictNJ
Aug 12, 2026
Closes
Sep 1, 2026
Replacement of hot water heaters and storage tanks at various sites.
CityAZ
Aug 16, 2026
Closes
Sep 3, 2026
The project consists of the rehabilitation of the water storage facilities, including the structural rehabilitation of the existing 500,000-gallon potable water storage tank, replacement of the existing roof system with a new steel roof structure and upgraded ventilation system, interior abrasive blasting and recoating of the potable water storage tank, rehabilitation and recoating of the hydropneumatic tanks, ASME recertification, replacement of the mounted air compressors, rehabilitation of selected site piping and appurtenances, recoating of the treatment system backwash tank, and all associated work necessary to reliable operational status, extend asset life, and ensure regulatory and safety compliance. The Contractor shall provide all labor, materials, equipment, testing, temporary facilities, traffic control, coordination, and incidentals required to complete the work
Harris County Water Control And Improvement District 110
Special DistrictTX
-
Closes
Sep 10, 2026
Work includes rehabilitation and painting of interior and exterior of ground storage tank no. 1, (212,00 gallons), ground storage tank no. 2, (750,000 gallons), hydropneumatic tank, including well no. 1 & 2 piping with valves, all located at water plant no. 1.
CityMI
Aug 24, 2026
Closes
Sep 8, 2026
Provide 2 brine storage tank snyder industrial mfg part #32815.