CountyAL
Posted
-
Sep 10, 2026
Midfield Hangar Construction at Cullman Regional Airport RFP
This RFP is for the construction of a midfield hangar, including grading, draining, basing, paving, electrical work, and the hangar building.
Description: This project consists of the construction of a new aircraft storage hangar. The scope of this work includes, but is not limited to concrete paving, earthwork, building foundation, pre-engineering metal building construction, sodding.
SpecialDistrict · FL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyAL
Posted
-
Sep 10, 2026
This RFP is for the construction of a midfield hangar, including grading, draining, basing, paving, electrical work, and the hangar building.
CountyNY
Posted
-
Sep 8, 2026
The solicitation is for construction of a new T-hangar at Plattsburgh International Airport in New York. The specific BidNet Direct record is an open-bids procurement listing, not a grant-program notice, and it was published on 08/12/2026 with a closing deadline of 09/08/2026 at 02:30 PM EDT, so it was still open on 2026-08-14. Clinton County directs vendors to its Empire State Purchasing Group/BidNet open-solicitations portal; the accessible record does not expose a primary PDF, DOCX, or PPT file or additional scope details without registration.
Lavaca-Navidad River Authority
Special DistrictTX
Posted
-
Sep 16, 2026
The RFP is for the fabrication of five (5) metal Municipal & Industrial (M&I) stoplogs.
Alaska Department of Military and Veterans Affairs
State AgencyAK
Posted
Aug 13, 2026
Sep 8, 2026
Install a new roof and siding hangar 4 at building 47645 (Hangar 4). Remove roofing, envelope and siding, replace roof membrane, seal all penetrations, replace all materials with new, use a dust control system system as not to introduce dust into any other parts of the building. Alternate 1 - contractor shall remove and replace all windows. Alternate 2 - exterior doors.