M&I STOPLOG CONSTRUCTION RFP
Posted
-
Sep 16, 2026
The RFP is for the fabrication of five (5) metal Municipal & Industrial (M&I) stoplogs.
Track open bid opportunities, contracts, public meetings, and key contacts for Lavaca-Navidad River Authority.
Share your ICP and we will surface 10 ready-to-buy accounts using buying signals, competitor contracts, and procurement activity for free
See my top accountsActive opportunities open for bidding
Posted
-
Sep 16, 2026
The RFP is for the fabrication of five (5) metal Municipal & Industrial (M&I) stoplogs.
Posted
-
Sep 10, 2026
Project consists of pump station expansion improvements, including the installation of a new pump and associated drive equipment, installation and integration of owner-pre-purchased electrical equipment, construction of a new pre-engineered metal building for electrical equipment, installation of a pile-supported foundation, installation of hvac equipment, valves, controls, instrumentation, medium voltage cabling, terminations, conduit, and related appurtenances.
Key metrics and characteristics
City
The city where this buyer is located.
Edna
County
The county where this buyer is located.
Jackson
Address
Physical address of this buyer.
4631 FM3131
Phone Number
Contact phone number for this buyer.
(361) 782-5229
Zip Code
Postal code for this buyer's location.
77957
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
Startup Friendliness
How often this buyer champions startups and early adoption.
Latest Budget Year
Unlock to view
Operating Budget
Unlock to view
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
AI-ranked best-fit opportunities before bid boards
Auto-drafted, compliance-ready outlines & boilerplate
Board meetings and strategic plans from Lavaca-Navidad River Authority
The Board meeting included a review of the General Manager's report, which covered various infrastructure and recreation projects, including the Palmetto Bend Dam Gantry Crane Project, ROW Gate Project, and BRC and Texana Church Flatwork Project. The Board approved the annual cybersecurity and artificial intelligence compliance training and authorized Capital Improvement Fund expenditures for roadway repairs at the Brackenridge Recreation Complex and LNRA Headquarters. Additionally, Black and Veatch was selected as the consultant for the seventh cycle of regional water management planning. The Board also approved a task authorization for Freese and Nichols regarding engineering support for the East Delivery System Pipeline Cross-connection Project and received updates on the West Delivery System Pump Station Expansion, Dam Safety Remediation Project, Lake Texana Yield Enhancement, and proposed recreational developments.
The Board held a workshop to review the General Manager's report, which included an update on the budget planning process and the introduction of a new Accounting Director. Key financial discussions focused on Reserve Fund balances, recommended thresholds, and long-term Capital Improvement Fund planning. Additionally, the Board reviewed the proposed Fiscal Year 2027 budgets across various departments, including the General Fund, Clean Rivers Program, Recreation, and Wastewater Treatment, with final consideration for approval scheduled for a future meeting.
Public-sector contacts connected to Lavaca-Navidad River Authority.
Get relevant Lavaca-Navidad River Authority bid alerts
Track Lavaca-Navidad River Authority bids, renewals, public meetings, and contact changes matched to what you sell.
Competitor & pricing intel from past awards
Native sync to Salesforce & HubSpot
The Clean Rivers Program Annual Meeting focused on discussing water quality issues with basin stakeholders and gathering guidance on resource utilization. Key discussion topics included updates to the 2027 water sampling schedule, which involves removing 24-hour dissolved oxygen monitoring at two sites and adding six new monitoring sites. The committee reviewed the Texas 2024 Integrated Report, focusing on water quality impairments and bacterial contamination mitigation efforts such as the Watershed Protection Plan. Additionally, the meeting featured a demonstration on using the LNRA Water Quality Database and a presentation regarding soil health and water quality.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Lavaca-Navidad River Authority meetings, strategic plans, and budget discussions before the public bid appears.
Early signals from meeting minutes and plans
Vendor mentions and competitor tracking
Decision timeline from discussion to RFP
Quotable insights from buyer leadership