Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of aeration improvements on existing water tower including pump station, piping and electrical.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Improvements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Improvements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
Premium
Access the largest public sector contact database
Scope of work generally includes the electrical construction modifications required for the improvements being constructed under the General Construction Contract including all equipment, building electrical, SCADA and control system improvements. Electrical contract also includes furnishing and installing replacement electric actuators for the existing filtration valves (valves to remain).
Posted Date
Dec 9, 2025
Due Date
Jan 5, 2026
Release: Dec 9, 2025
Close: Jan 5, 2026
Scope of work generally includes the electrical construction modifications required for the improvements being constructed under the General Construction Contract including all equipment, building electrical, SCADA and control system improvements. Electrical contract also includes furnishing and installing replacement electric actuators for the existing filtration valves (valves to remain).
AvailableComplete the electrical installation for the new owner-furnished, factory-built packaged pump station. The pump station enclosure, pumps, and control systems are substantially prewired by the manufacturer; however, the electrical contractor shall provide incoming service to the control panel, grounding of the station, and all conduit, wiring, and terminations necessary to connect field-installed equipment to the factory-supplied terminal blocks.
Posted Date
Dec 4, 2025
Due Date
Jan 5, 2026
Release: Dec 4, 2025
Close: Jan 5, 2026
Complete the electrical installation for the new owner-furnished, factory-built packaged pump station. The pump station enclosure, pumps, and control systems are substantially prewired by the manufacturer; however, the electrical contractor shall provide incoming service to the control panel, grounding of the station, and all conduit, wiring, and terminations necessary to connect field-installed equipment to the factory-supplied terminal blocks.
AvailableComplete the electrical installation for the new owner-furnished, factory-built packaged pump station. The pump station enclosure, pumps, and control systems are substantially prewired by the manufacturer; however, the electrical contractor shall provide incoming service to the control panel, grounding of the station, and all conduit, wiring, and terminations necessary to connect field-installed equipment to the factory-supplied terminal blocks.
Posted Date
Dec 4, 2025
Due Date
Jan 5, 2026
Release: Dec 4, 2025
Close: Jan 5, 2026
Complete the electrical installation for the new owner-furnished, factory-built packaged pump station. The pump station enclosure, pumps, and control systems are substantially prewired by the manufacturer; however, the electrical contractor shall provide incoming service to the control panel, grounding of the station, and all conduit, wiring, and terminations necessary to connect field-installed equipment to the factory-supplied terminal blocks.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis