CountyMS
Aug 6, 2026
Closes
Sep 21, 2026
Construction of 59.933 Miles of Maintenance (other Than Bridge) On the Roads "A" - "M"
Work inlcudes roadway items:1,220.000 LF of Removal of Existing Traffic Stripe; 3,260.000 CY of Unclassified Excavation ; 289 ton of Asphalt, ST, 9.5 mm; 48045 SY of Cold Milling of Bituminous Pavement, All Depths; 2142 LF of Thermoplastic Detail Stripe (4" Equivalent Length) (White) (60 mils); EROSION CONTROL ITEMS 1.500 ton of Agricultural Limestone ; 3.841 MI of 4"-Wide Thermoplastic Edge Stripe (Continuous White) (60 mils); 2169 LF of Removal of Existing Traffic Stripe .