Open RFP

Construction of 59.933 Miles of Maintenance (other Than Bridge) On the Roads "A" - "M"

Description: Work inlcudes roadway items:1,220.000 LF of Removal of Existing Traffic Stripe; 3,260.000 CY of Unclassified Excavation ; 289 ton of Asphalt, ST, 9.5 mm; 48045 SY of Cold Milling of Bituminous Pavement, All Depths; 2142 LF of Thermoplastic Detail Stripe (4" Equivalent Length) (White) (60 mils); EROSION CONTROL ITEMS 1.500 ton of Agricultural Limestone ; 3.841 MI of 4"-Wide Thermoplastic Edge Stripe (Continuous White) (60 mils); 2169 LF of Removal of Existing Traffic Stripe .

Buyer
Greene County

County · MS, US

Released
Aug 6, 2026
Closes
Sep 21, 2026(21 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts