Open RFP

Construction of 9.295 Miles of Maintenance (other Than Bridge)

Description: Work inlcudes 1,424 LF removal of existing traffic stripe; 668 CY unclassified excavation (fm); 7,805 TN asphalt, st, 9.5mm; 668 TN crushed stone (size 610); 5,173 TN asphalt, st, 9.5mm; 661 TN asphalt, st, 12.5mm (base repair); 473 TN asphalt, st, 9.5mm (leveling); 1,666 SY cold milling of bituminous pavement, all depths; 265 CY blotter material (lvm); 0.135 mi 4"-wide cold-plastic edge stripe (continuous white); 712 LF 4"-wide cold-plastic traffic stripe (continuous yellow); 18.612 mi 4"-wide thermoplastic edge stripe (continuous white) (60 mils); 92,893 LF 4"-wide thermoplastic traffic stripe (continuous yellow) (90 mils).

Buyer
Perry County

County · MS, US

Released
Jul 30, 2026
Closes
Sep 1, 2026(26 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts