SAP-45(24)M - 0.312 mi. of Maintenance (Other than Bridge)
Project consist of 878 TN of Asphalt, (ST), (9.5 mm); 71 CY of excavation; 10,642 SY of Cold Milling of Bituminous Pavement, All Depths; 2,921 LF of 4"-Wide Temporary Traffic Stripe, Continuous White; 1,300 LF of 4"-Wide Temporary Traffic Stripe, Continuous Yellow; 2,665 LF of Thermoplastic Detail Stripe (6" Equivalent Length) (Yellow) (60 mils).