California State University Northridge
Higher EducationCA
Posted
Sep 18, 2026
Dec 17, 2026
PW2602 University Library (UL) Egress Stair
The project consists of constructing a new interior egress stair within the University Library to provide code-compliant exiting, improve fire and life safety, and address critical deferred-maintenance needs. The solicitation covers construction services for the stair project at CSU, Northridge, including associated building work described in the project requirements. The event is open through December 17, 2026, at 3:00 PM PST, with a non-mandatory pre-bid conference scheduled for October 1, 2026.