Open RFP

Construction Management Services for TRWQCF Primary Flotator Improvements Project RFP

Description: The City of Turlock is requesting proposals from qualified firms to provide construction management services for City Project No. 25-058: Turlock Regional Water Quality Control Facility Primary Flotator Improvements Project. Proposals must be submitted before the deadline specified in the RFP. Qualified vendors should review the full RFP for submission requirements, scope of services, and evaluation criteria. In the heart of California’s Central Valley, Turlock is the second largest city in Stanislaus County located 100 miles south of Sacramento, CA covering an area just over 16 square miles with a population of over 73,000. Turlock is a General Law City that operates under the Council/Manager form of government. The City of Turlock owns and maintains the Turlock Regional Water Quality Control Facility (TRWQCF), which treats wastewater from the City’s current population along with industries, businesses, California State University Stanislaus, the neighboring Community Service Districts of Denair and Keyes, and primary treated wastewater from the City of Ceres.  The current permitted capacity of the TRWQCF is 20 MGD and is comprised of primary, secondary and tertiary treatment before being recycled for industrial cooling, irrigation purposes, the North Valley Regional Recycled Water Program or discharged into San Joaquin River. The facility has been constructed in multiple phases over a 50 year period.  Several facilities related to flotation clarifier number 1 and 2, including flumes reconstruction, the air delivery systems, electrical motor control centers, sludge pumping system, grit conveyance pumps, yard piping, minor concrete, and asphalt concrete paving are in need of rehabilitation due to asset age and the corrosive environment of the TRWQCF.  This project is intended to be funded solely through local funding sources without reliance on state or federal grants.   Project plans and specifications have been prepared by Carollo Engineers for the subject project.  Carollo Engineers will remain engaged in the project during construction as the engineer of record, by assisting City with bidding services and providing services during construction such as RFI and submittal review, and issuing design changes as needed given the conditions encountered during construction.  Carollo Engineers will also provide the SCADA programming necessary to integrate the monitoring and operation of facilities included in the scope of work into the City’s SCADA system. City is in need of a qualified consultant to provide comprehensive construction management (CM) services.  An agreement for construction is estimated to be approved by the City Council either concurrent with, or immediately before or after approval of an agreement for construction management services.  City staff intend to not issue the Notice to Proceed to the contractor until the selected CM consultant agreement has been fully executed.  City staff will work closely with Carollo Engineers and the selected CM consultant as a result of this RFP to provide proper oversight and management of the construction project’s progress.

Buyer
City of Turlock

City · CA, US

Released
Nov 24, 2026
Closes
Dec 21, 2026(24 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts