CityOR
Posted
Oct 5, 2026
Oct 29, 2026
Construction Doc2403772358 CBWTP HW & WWIPS VFD REPLACEMENT
The ITB covers replacing 15 variable frequency drives (VFDs) and enclosures, and adding one new VFD and enclosure for pumps at the Headworks and Influent Pump Station. It also includes replacing flow switches with flow meters and providing accessible power meters tied into the existing SCADA system. The City's construction forecast describes the work as replacing end-of-life VFDs for influent pumps at CBWTP Headworks and the Influent Pump Station.
