Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes various upgrades to the parking lot, including regrading, paving, stormwater management, landscaping, and accessible parking and sidewalk improvements. Work also includes 1 LS erosion and sediment control; 200 CY class 1 excavation; 120 LS remove and replace 2-inch water line; 160 TN hma superpave 19.0mm for base, pg 64s, level 2 (3.5" depth); 470 LF 5-inch white pavement marking paint lines; 2 EA white preformed thermoplastic pavement marking legends and symbols "handicap parking". See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Seeking proposals from qualified proposers for school parking lot improvements. Install silt fence around down gradient perimeter and install antitracking pad prior to site work. Remove all surficial features designated for removal and disposal. Buried concrete sidewalk material along building to be exposed and full extents to established prior to removal.
Posted Date
Jan 9, 2026
Due Date
Feb 6, 2026
Release: Jan 9, 2026
Close: Feb 6, 2026
Seeking proposals from qualified proposers for school parking lot improvements. Install silt fence around down gradient perimeter and install antitracking pad prior to site work. Remove all surficial features designated for removal and disposal. Buried concrete sidewalk material along building to be exposed and full extents to established prior to removal.
AvailableDunklin R-5 School District seeks services for parking lot improvements, including sealing, cleaning, crack filling, and striping.
Posted Date
-
Due Date
Jan 30, 2026
Release: -
Close: Jan 30, 2026
Dunklin R-5 School District seeks services for parking lot improvements, including sealing, cleaning, crack filling, and striping.
AvailableThe University of Connecticut is soliciting bids for improvements to Parking Lot L, a public works construction project expected to award in early 2026. The procurement seeks contractors to perform typical parking lot rehabilitation work (e.g., resurfacing/repaving, drainage and ADA/striping) with construction scheduled for summer 2026. Bids are due January 21, 2026 following a posting on December 15, 2025.
Posted Date
Dec 15, 2025
Due Date
Jan 21, 2026
Release: Dec 15, 2025
Close: Jan 21, 2026
The University of Connecticut is soliciting bids for improvements to Parking Lot L, a public works construction project expected to award in early 2026. The procurement seeks contractors to perform typical parking lot rehabilitation work (e.g., resurfacing/repaving, drainage and ADA/striping) with construction scheduled for summer 2026. Bids are due January 21, 2026 following a posting on December 15, 2025.
AvailableParking lot improvements project.
Posted Date
Jan 2, 2026
Due Date
Feb 5, 2026
Release: Jan 2, 2026
Close: Feb 5, 2026
Parking lot improvements project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis