Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Concrete replacement work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Concrete lot replacement.
Posted Date
Nov 12, 2025
Due Date
Jan 9, 2026
Release: Nov 12, 2025
Close: Jan 9, 2026
Concrete lot replacement.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal and replacement of concrete sidewalk, pedestrian curb ramps, crosspans, curb and gutter, and median modifications across multiple neighborhoods and roadways.
Posted Date
Dec 19, 2025
Due Date
Jan 16, 2026
Release: Dec 19, 2025
Close: Jan 16, 2026
Removal and replacement of concrete sidewalk, pedestrian curb ramps, crosspans, curb and gutter, and median modifications across multiple neighborhoods and roadways.
AvailableWork includes the removal and replacement of approx 10,729 SY of concrete pavement on various streets in the city.
Posted Date
Jan 8, 2026
Due Date
Jan 22, 2026
Release: Jan 8, 2026
Close: Jan 22, 2026
Work includes the removal and replacement of approx 10,729 SY of concrete pavement on various streets in the city.
AvailableWork include 11,495 SY concrete replacement, 8" thick with empc concrete; 400 SY concrete replacement, 8" thick with 8.25 s; 80 CY remove unsuitable subgrade; 40 CY replace unsuitable material with type 5 base rock; 3,500 LF vertical curb replacement; 200 SF sidewalk replacement, including ramp; 40 SF detectable warning panel @ ada ramp;
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Work include 11,495 SY concrete replacement, 8" thick with empc concrete; 400 SY concrete replacement, 8" thick with 8.25 s; 80 CY remove unsuitable subgrade; 40 CY replace unsuitable material with type 5 base rock; 3,500 LF vertical curb replacement; 200 SF sidewalk replacement, including ramp; 40 SF detectable warning panel @ ada ramp;
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →