Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes : 1 LS concrete & subgrade removal with environmental controls; 24 SF any required additional concrete demolition and removal, including subgrade (beyond the 6'x4' excavation); 1 LS backfill, concrete restoration & cleanout cover installation; 24 SF any required additional reinforcement, concrete and subgrade, including compaction (beyond the 6'x4' excavation); see attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The solicitation requests quotes for concrete and subgrade removal, restoration, and cleanout cover installation at 1824 Williamson Rd., Roanoke, VA 24012. A non-mandatory onsite pre-quote meeting is scheduled for January 6, 2026 at 1:00 PM; quotes are due January 16, 2026. The procurement is for municipal site/infrastructure work (not a grant) and appears open as of 2025-12-24.
Posted Date
Dec 20, 2025
Due Date
Jan 16, 2026
Release: Dec 20, 2025
Close: Jan 16, 2026
The solicitation requests quotes for concrete and subgrade removal, restoration, and cleanout cover installation at 1824 Williamson Rd., Roanoke, VA 24012. A non-mandatory onsite pre-quote meeting is scheduled for January 6, 2026 at 1:00 PM; quotes are due January 16, 2026. The procurement is for municipal site/infrastructure work (not a grant) and appears open as of 2025-12-24.
AvailableThis project will consist of the removal and disposal of concrete and rock masonry portal sign bases in clear zones, the removal and disposal of existing wood portal signs, construction of new portal sign bases, and installation of government-furnished signs.
Posted Date
Dec 19, 2025
Due Date
Jan 23, 2026
Release: Dec 19, 2025
Close: Jan 23, 2026
This project will consist of the removal and disposal of concrete and rock masonry portal sign bases in clear zones, the removal and disposal of existing wood portal signs, construction of new portal sign bases, and installation of government-furnished signs.
AvailableThe Work to be performed is sediment removal and restoration of five stormwater ponds includes, but is not limited to: Mobilization of labor, equipment, materials, and temporary facilities; installation of safety measures, establishing limits of staging and construction, and protecting of all existing utilities, trees and structures as specified on the plans; traffic control at and around construction sites; installation of erosion control BMPs in accordance with project SWPPP; control of water and/or dewatering as necessary to perform the Work; pre-construction topographic survey of the five ponds performed by licensed surveyor; clearing, grubbing, and tree removal; removal of accumulated sediment/muck/vegetation from five stormwater ponds; hauling and disposal of sediment/muck/vegetation material to a Municipal Solid Waste (MSW) landfill that can accept non-hazardous contaminated sediment; Furnishing and placement of riprap at pond inlets, outlets, and overflow structures; performance of post-construction topographic survey of the five ponds; clean-up and restoration of all areas directly or indirectly disturbed by the Work to the pre-existing conditions or as specified on the plans; demobilization from the site after work is complete.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
The ITB PW 2026 Concrete Restoration Contract 3 (Project No. 106668, Ref. #: 26-0075) was posted on Dec 17, 2025 and will close on Jan 15, 2026. The solicitation seeks contractors for approximately 11,260 SY of 9" concrete pavement, 9,472 SY of 6" concrete pavement, 4,100 CY of flex base, 18,250 SY of geogrid, and other related work. Supporting documentation is available on the Bonfire portal but requires a login to download.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
The ITB PW 2026 Concrete Restoration Contract 3 (Project No. 106668, Ref. #: 26-0075) was posted on Dec 17, 2025 and will close on Jan 15, 2026. The solicitation seeks contractors for approximately 11,260 SY of 9" concrete pavement, 9,472 SY of 6" concrete pavement, 4,100 CY of flex base, 18,250 SY of geogrid, and other related work. Supporting documentation is available on the Bonfire portal but requires a login to download.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 15, 2026
The Work to be performed is sediment removal and restoration of five stormwater ponds includes, but is not limited to: Mobilization of labor, equipment, materials, and temporary facilities; installation of safety measures, establishing limits of staging and construction, and protecting of all existing utilities, trees and structures as specified on the plans; traffic control at and around construction sites; installation of erosion control BMPs in accordance with project SWPPP; control of water and/or dewatering as necessary to perform the Work; pre-construction topographic survey of the five ponds performed by licensed surveyor; clearing, grubbing, and tree removal; removal of accumulated sediment/muck/vegetation from five stormwater ponds; hauling and disposal of sediment/muck/vegetation material to a Municipal Solid Waste (MSW) landfill that can accept non-hazardous contaminated sediment; Furnishing and placement of riprap at pond inlets, outlets, and overflow structures; performance of post-construction topographic survey of the five ponds; clean-up and restoration of all areas directly or indirectly disturbed by the Work to the pre-existing conditions or as specified on the plans; demobilization from the site after work is complete.
Available