OtherIL
Jun 13, 2026
Closes
Aug 29, 2026
ComEd - TSS 242 Greenleaf Grading & Drainage
Installation of all civil structures, grounding and fence and wall installation and foundations needed for the security installations. Fire system installation.
Description: Work includes construction of a new prefabricated walls with steel frame equipment enclosure. The building is a combined switchgear and control enclosure. The work includes furnishing and installing the foundation, anchors building exterior and interior build out. The enclosure includes an underground cable space. There is one shared battery room. Installation of building structural, foundation wall panels, feeder conduits & ducts, HVAC, building electrical, and finishes. The vendor is to furnish and install the following: full basement across both the switchgear and control building sides; building foundation & appropriate penetrations per drawings pre-cast walls.
Other · IL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
OtherIL
Jun 13, 2026
Closes
Aug 29, 2026
Installation of all civil structures, grounding and fence and wall installation and foundations needed for the security installations. Fire system installation.
Special DistrictWA
-
Closes
Aug 26, 2026
LOTT Clean Water Alliance is soliciting bids for replacement work at Substation A/B inside the headworks building at the Budd Inlet Treatment Plant in Olympia, Washington. The owner will provide the new 15kV fused switches and oil-filled transformers, while the contractor will remove the existing equipment and install the owner-furnished equipment. A pre-bid meeting and site visit are scheduled for August 4, 2026, with questions due August 12 and responses due August 26, 2026; this is a construction procurement, not a grant program.
Volusia County School District
School DistrictFL
-
Closes
Oct 15, 2026
Replace main switchboard MDP in Building 4 and service feeders back to the utility transformer; replace distribution panel ‘P4' and the feed connecting it to switchgear MDP; replace 150kva transformer 'T401' and the feeder connecting it to distribution panel 'P4'; replace distribution panel 'M401' and the feed connecting it to 150kva transformer 'T401; eliminate panel EM1 and relocate circuits to panel P4; clean and reseal concrete floor; replace lighting in main electrical room.
Alexandria Sanitation Authority
Special DistrictVA
-
Closes
Sep 15, 2026
AlexRenew is soliciting bids for labor, equipment, parts, consumables, and related work necessary to perform switchgear inspection, testing, and repair services. A mandatory prebid meeting and site tour is scheduled for August 25, 2026, from 10:00 AM to 12:00 PM ET at AlexRenew’s Environmental Center in Conference Room 605. Bids are due September 15, 2026, at 2:00 PM ET, and the opportunity is an open Invitation for Bids rather than a grant program.