Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
ComEd(Commonwealth Edison)
Structural & Physical Construction: Remove existing foundations as noted in issued drawings; install footings for all new 345kV circuit breakers, MODs, CCVTs, and associated equipment being installed. See foundation plans and details; install conduit and precast trough to the new equipment; hydrovac and backfill for all installed grounding. Material and installation by ComEd; complete excavation and hydrovac. Spoil to be loaded and hauled by civil COC. See outside link.
Posted Date
Jun 10, 2026
Due Date
Jun 27, 2026
Release: Jun 10, 2026
ComEd(Commonwealth Edison)
Close: Jun 27, 2026
Structural & Physical Construction: Remove existing foundations as noted in issued drawings; install footings for all new 345kV circuit breakers, MODs, CCVTs, and associated equipment being installed. See foundation plans and details; install conduit and precast trough to the new equipment; hydrovac and backfill for all installed grounding. Material and installation by ComEd; complete excavation and hydrovac. Spoil to be loaded and hauled by civil COC. See outside link.
AvailableComEd(Commonwealth Edison)
Demolition of existing foundations, conduit, grounding, bus supports, capacitor bank structures, cap switcher foundations, and associated below grade facilities required for installation of the new 138kV Cap Bank 1 & 2 equipment per engineering drawings and demolition plans.
Posted Date
Jun 11, 2026
Due Date
Jun 19, 2026
Release: Jun 11, 2026
ComEd(Commonwealth Edison)
Close: Jun 19, 2026
Demolition of existing foundations, conduit, grounding, bus supports, capacitor bank structures, cap switcher foundations, and associated below grade facilities required for installation of the new 138kV Cap Bank 1 & 2 equipment per engineering drawings and demolition plans.
ComEd(Commonwealth Edison)
Civil work to support upgrading (12) 12kv breakers using existing foundations -A661, A6616, A662, A663, A6621, A6625, A6618, A6619, A6617, A6626, A6623, TR74 CB’s. Civil work to support upgrading TR72 12kv breakers and new foundation. Hydrovacing for conduit runs, some under 12kV bus and inside a wildlife fence.
Posted Date
Jun 10, 2026
Due Date
Jun 23, 2026
Release: Jun 10, 2026
ComEd(Commonwealth Edison)
Close: Jun 23, 2026
Civil work to support upgrading (12) 12kv breakers using existing foundations -A661, A6616, A662, A663, A6621, A6625, A6618, A6619, A6617, A6626, A6623, TR74 CB’s. Civil work to support upgrading TR72 12kv breakers and new foundation. Hydrovacing for conduit runs, some under 12kV bus and inside a wildlife fence.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge