ComEd(Commonwealth Edison)
This bid is for substation equipment foundations as listed but not limited to and the installation (1) precast building including but not limited to foundation system (masonry walls including awnings, floor, entry and mechanical slabs, precast roof panels, system, fire protection systems and install a substation access road.
Posted Date
Apr 27, 2026
Due Date
May 7, 2026
Release: Apr 27, 2026
ComEd(Commonwealth Edison)
Close: May 7, 2026
This bid is for substation equipment foundations as listed but not limited to and the installation (1) precast building including but not limited to foundation system (masonry walls including awnings, floor, entry and mechanical slabs, precast roof panels, system, fire protection systems and install a substation access road.
AvailableComEd(Commonwealth Edison)
Install 45'-1 Fiberglass pole as a Cable Term Pole; Install 400' of underground conduit from the proposed Cable Term Pole to the existing switchgear; Install a new 4-Bay Switchgear between TR. 21 and TR. 76; New switchgear to be installed just northwest of Manhole #3 entrance; Install 50' of conduit from the proposed switchgear to intercept conduit coming from the TR. 76 tertiary; Install 120' of underground conduit from TR.12 to TR.31.
Posted Date
-
Due Date
May 5, 2026
Release: -
ComEd(Commonwealth Edison)
Close: May 5, 2026
Install 45'-1 Fiberglass pole as a Cable Term Pole; Install 400' of underground conduit from the proposed Cable Term Pole to the existing switchgear; Install a new 4-Bay Switchgear between TR. 21 and TR. 76; New switchgear to be installed just northwest of Manhole #3 entrance; Install 50' of conduit from the proposed switchgear to intercept conduit coming from the TR. 76 tertiary; Install 120' of underground conduit from TR.12 to TR.31.
AvailableComEd(Commonwealth Edison)
Foundation work for transmission tower construction project.
Posted Date
Apr 27, 2026
Due Date
May 4, 2026
Release: Apr 27, 2026
ComEd(Commonwealth Edison)
Close: May 4, 2026
Foundation work for transmission tower construction project.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track ComEd(Commonwealth Edison)'s board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database