Indiana Department of Transportation
State AgencyIN
Aug 5, 2026
Closes
Sep 2, 2026
Bridge Thin Deck Overlay
Work includes bridge thin deck overlay. Description: 1 LS of construction engineering; 1 LS of mobilization and demobilization; 162 SY of subgrade treatment, type ii; 12 CY of flowable backfill, non-removable; 162 SY of geogrid, type IB; 160 ton of HMA patching, full depth, type D; 15522 SY of milling, asphalt, 1 1/2 in.; 1281 ton of QC/QA-HMA, 4, 58E, surface, 9.5 mm; 8499 LF of void reducing asphalt membrane for HMA; 6 ton of asphalt for tack coat; 12 SY of pccp patching, partial depth; 82 LF of cracks in PCCP, rout and seal; 652 LF of joints in PCCP, saw and seal; 24 EA of barrier delineator; 8499 LF of milled HMA corrugations, conventional; 272 ton of riprap, revetment. See attached file.