CityTN
Posted
Sep 10, 2026
Oct 8, 2026
Clabo Loop Slope Repair RFP
Clearing and grubbing over 2,650 SF; Topsoil removal and stockpiling over 50 CY; Earthwork excavation over 443 CY; Asphalt removal over 53 CY; Silt fence installation over 299 LF; Redi-Rock wall over 2,634 SF; No. 57 Stone wall backfill over 146 CY; Dense-Graded Aggregate wall materials over 42 CY; Asphalt Base Stone over 53 CY.
