Lincoln Village Neighborhood Street Rehabilitation Project - Phase 1 RFP
Work consist of 96,861 sf of remove base & surfacing,108 cy of unsuitable material excavation & backfill, 715 lf of tree root control barrier, 4 ea of remove di, 8 ea of remove & replace with di, 1,854 lf of 12" sd pipe, 26 lf of remove sd pipe, 5 ea of remove & replace with di, 197 lf of remove & replace with 12" sd pipe, 31 ea of connect to existing storm drain manhole, 6 ea of repair storm drain manhole, v ea of cut & cap sd pipe, 9 ea of cap di lead at manhole, 56,132 sf of concrete sidewalk, 796 sf of pcc driveway conform, 7,623 lf of concrete curb & gutter, 1 ea of install pedestrian push button, 2 ea of relocate streetlight box.