North Main Street Resurfacing Project RFP
Posted
Nov 14, 2026
Dec 1, 2026
Work include 16,000 SY of mill HMA/PCCP pavement, 2"; 160 SY of pavement removal, full depth, undistributed; 2,000 SF of concrete sidewalk removal, undistributed; 300 LF of curb removal, undistributed; 12 EA of water valve box, adjust to grade; 5 EA of manhole casting, adjust to grade, retain casting; 20 EA of curb inlet casting, adjust to grade, retain casting; 800 LF of straight curb, 6 inches by 18 inches, concrete; 2,000 SF of ADA compliant sidewalk curb ramp, PCCP, 6"; 8 EA of ADA compliant detectable warning surface plate. See outside link.