Open RFP

Lincoln Village Neighborhood Street Rehabilitation Project - Phase 1 RFP

Description: Work consist of 96,861 sf of remove base & surfacing,108 cy of unsuitable material excavation & backfill, 715 lf of tree root control barrier, 4 ea of remove di, 8 ea of remove & replace with di, 1,854 lf of 12" sd pipe, 26 lf of remove sd pipe, 5 ea of remove & replace with di, 197 lf of remove & replace with 12" sd pipe, 31 ea of connect to existing storm drain manhole, 6 ea of repair storm drain manhole, v ea of cut & cap sd pipe, 9 ea of cap di lead at manhole, 56,132 sf of concrete sidewalk, 796 sf of pcc driveway conform, 7,623 lf of concrete curb & gutter, 1 ea of install pedestrian push button, 2 ea of relocate streetlight box.

Buyer
Released
Nov 13, 2026
Closes
Dec 10, 2026(15 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts