Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Asheville issued an RFQ seeking Statements of Qualifications from professional services engineers to perform repairs and replacements at approximately 50 stormwater infrastructure locations damaged by a storm (Helene Recovery Project). The work is federally funded and may include pipe, catch basin, junction box, head/end wall, inlet/outlet repairs and potential small stream restoration; period of performance is projected to start April 2026. Statements of Qualifications are due January 29, 2026 and bidders must comply with NC General Statute §143-64.31 and applicable Federal procurement regulations (CFR 200.317–200.327).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Asheville seeks engineering and design services for the permanent restoration and hazard mitigation of city-wide stormwater infrastructure (pipes, catch basins, junction boxes, head/end walls, inlets, outlets, and Stormwater Control Measures) damaged by Hurricane Helene. Services include design, inspections, modeling, permitting, cost analysis, construction drawings, and contract administration.
Posted Date
Dec 19, 2025
Due Date
Jan 29, 2026
Close: Jan 29, 2026
The City of Asheville seeks engineering and design services for the permanent restoration and hazard mitigation of city-wide stormwater infrastructure (pipes, catch basins, junction boxes, head/end walls, inlets, outlets, and Stormwater Control Measures) damaged by Hurricane Helene. Services include design, inspections, modeling, permitting, cost analysis, construction drawings, and contract administration.
AvailableWork includes rehabilitate existing gravity feed storm lines as indicated on plans/item list with suitable cured-in-place pipe (cipp) lining product. Excavation to access to storm lines and restoration of said excavations. Debris removed from storm line can be placed at city-designated area. Contractor will be responsible for providing erosion, sediment, and pollution control. The contractor shall always maintain adequate storm drainage in work areas during construction.
Posted Date
Jan 13, 2026
Due Date
Feb 3, 2026
Release: Jan 13, 2026
Close: Feb 3, 2026
Work includes rehabilitate existing gravity feed storm lines as indicated on plans/item list with suitable cured-in-place pipe (cipp) lining product. Excavation to access to storm lines and restoration of said excavations. Debris removed from storm line can be placed at city-designated area. Contractor will be responsible for providing erosion, sediment, and pollution control. The contractor shall always maintain adequate storm drainage in work areas during construction.
The City of Stamford issued a combined RFQ/RFP seeking stormwater monitoring services during construction of the new Westhill High School. The solicitation (Opportunity ID 2026.0244) was posted on 2026-01-08 and proposals are due 2026-01-29 at 4:00 PM ET. The work is funded in whole or in part with State of Connecticut DAS funds and follows Sec. 10-287 (combined RFQ/RFP).
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
The City of Stamford issued a combined RFQ/RFP seeking stormwater monitoring services during construction of the new Westhill High School. The solicitation (Opportunity ID 2026.0244) was posted on 2026-01-08 and proposals are due 2026-01-29 at 4:00 PM ET. The work is funded in whole or in part with State of Connecticut DAS funds and follows Sec. 10-287 (combined RFQ/RFP).
Provide Repairs and Replacements of the Eastside Park Stairs.
Posted Date
Jan 15, 2026
Due Date
Feb 18, 2026
Release: Jan 15, 2026
Close: Feb 18, 2026
Provide Repairs and Replacements of the Eastside Park Stairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis