CountyAL
Aug 14, 2026
Closes
Sep 23, 2026
2024 AMP12 - Cedar Hill SSO Abatement RFP
Upsizing of approx., 2,417 LF of 24" ductile iron pipe to 36" from the planned halls branch diversion structure to just upstream of manhole 1005-030; Installation of eleven 60" diameter precast concrete manholes with transition to 48" diameter riser sections with bolt-down (watertight) manhole frame and cover; installation of approx., 250 LF of 36" cured-in-place pipe lining; Installation of cast-in-place concrete diversion structure with monolithic liner, 24" ductile iron diversion piping, and 72" diameter inside drop manhole with monolithic liner on existing 36-inch diameter ductile iron sewer; Approx., 28 SY of asphalt roadway pavement repair; Site restoration work.