Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project generally consists of the following: furnish and install all materials, and equipment for the construction of improvements to city raw water pump station. Work includes but is not limited to the following: removal of existing pond vegetation within the limits of construction as shown on the contract drawings. Installation of coffer dam / sheet piling methods to accommodate the installation of both the rip rap shoring, intake screen and associated piping. Contractor shall submit means. See attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement for the construction and installation of Raw Water Intake Pump Station Improvements 2025, including replacement of a butterfly valve, gate actuator, submerged coarse bar screen, addition of a screen deflector unit, associated electrical work, and temporary bypass pumping.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
Procurement for the construction and installation of Raw Water Intake Pump Station Improvements 2025, including replacement of a butterfly valve, gate actuator, submerged coarse bar screen, addition of a screen deflector unit, associated electrical work, and temporary bypass pumping.
AvailableWork include pump station rehabilitation. Works includes electrical.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Work include pump station rehabilitation. Works includes electrical.
AvailableWork includes : rehabilitation of a 40 million gallon per day (mgd) pump station, including replacement of instrumentation and controls equipment.
Posted Date
Dec 16, 2025
Due Date
Jan 20, 2026
Release: Dec 16, 2025
Close: Jan 20, 2026
Work includes : rehabilitation of a 40 million gallon per day (mgd) pump station, including replacement of instrumentation and controls equipment.
AvailableWork consists of a new stormwater pump station c-14 stormwater pump station.
Posted Date
Nov 16, 2025
Due Date
Jan 22, 2026
Release: Nov 16, 2025
Close: Jan 22, 2026
Work consists of a new stormwater pump station c-14 stormwater pump station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis