Wastewater Treatment Plant Polymer
Seeking cost proposals for dewatering polymer.
Description: The City of Columbus is soliciting bids under Contract 2-2025 for construction of a new wastewater treatment facility, including influent screening and an activated sludge package treatment plant, with an estimated value of $14,700,000.00. The posting schedules a pre-bid meeting for 9/22/2026 at 8:00 AM at the City of Columbus, 605 Spring Street, and a bid opening for 10/15/2026 at 12:00 PM. This CivCast item is a construction procurement rather than a grant application; related City material identifies the broader project under GLO Contract #24-065-060-E570, and the October 15, 2026 bid date is after the current date of September 7, 2026.
City · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityND
Posted
Aug 11, 2026
Nov 3, 2026
Seeking cost proposals for dewatering polymer.
CityTN
Posted
-
Sep 17, 2026
Construction of one new SBR basin, new disinfection system, one sludge thickener, one new sludge pumping station, two sludge digesters, new sludge dewatering building, new storage building. All associated site work. All associated piping and electrical.
Atwood Regional Water And Sewer District
Special DistrictOH
Posted
Aug 21, 2026
Sep 10, 2026
Division 1 base bid: encompass work within the wastewater treatment plant including replacement of process equipment (splitter box, blowers, air piping, diffusors, clarifier equipment and digester air system) a new generator, electrical upgrades, installation of gravity sewer piping, and construction of a new building to house the blowers and electrical components. Alternate 1: includes all labor, material, equipment, and appurtenances to provide and install mechanical screen location and appurtenances in the headworks building as shown on the plans and as stated in the specifications. Includes all concrete work associated with channel relocation, electrical improvements and mechanical screen location. Alternate 2: includes all associated labor, material, equipment, and appurtenances to provide and install all blowers, diffusers, and accessories for the project as shown on the plans and as stated in the specifications. Division 2 base bid: includes construction of the new administration building, new water supply well, grinder pump station and electrical installation. Alternate 1: includes removal and replacement of concrete floors and drive approach to an existing storage building.
CityTN
Posted
-
Sep 29, 2026
Wastewater sludge removal and disposal.
Decision makers connected to this RFP from City of Columbus.