Description: Rehabilitation of an existing lift station with new pumps, work to the wetwell structure, and the trenchless installation of 800 LF of 8” forcemain together with other equipment and appurtenances for a complete and working lift station system.
City · NE, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from City of Bellevue.
These related opportunities are still open for bidding.
CountyFL
Posted
Sep 21, 2026
Oct 22, 2026
The work to be done consists of repairing or rehabilitating the sewer lift station, including essential bypass pumping, wet well restoration, replacement of damaged structural, mechanical, and electrical components, and final site restoration as directed.
Ellijay-Gilmer County Water & Sewerage Authority
Special DistrictGA
Posted
-
Nov 12, 2026
Under this project, the Contractor must furnish the labor and materials necessary to install approx., ±271 LF of 8" SDR 26 PVC gravity sewer, ±55 LF of 2" SCH 80 PVC force main, ±60 LF of 2" PE force main, and a packaged duplex lift station with 2 HP pumps. Installation shall include all work shown in the construction plans, including valves, manholes, and other appurtenances.
Stuttgart Municipal Water Works
Special DistrictAR
Posted
Sep 27, 2026
Oct 27, 2026
The project generally consists of construction of a new 240 gallons per minute (GPM) sewage lift station together with incidental and ancillary work.
Collegeville Trappe Municipal Authority & Public Works
Special DistrictPA
Posted
Aug 11, 2026
Oct 15, 2026
Work includes updates to an existing lift station including: replacement of the existing sewage lift station pumps, construction of a new meter pit, electrical upgrades, miscellaneous site improvements, installation and integration of SCADA system for remote monitoring of the lift station, and all necessary appurtenances and restoration for said construction. Work includes, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all General/ Mechanical, and Electrical Construction in accordance with the Contract Documents.