Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Drainage Improvements Project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of University Place seeks qualified consultants to provide surveying services for the 67th Ave W Improvements Phase 3 project, spanning Cirque Dr W to 40th St W. Planned improvements include curb, curb ramps, gutters, landscaped pedestrian buffers, sidewalks, bicycle lanes, streetlights, an audible pedestrian signal at 67th and 44th, pavement markings, pedestrian/bicycle amenities, speed feedback signs, and median enhancements. The project schedule targets consultant agreement execution by December 15, 2025, with deliverables due by February 15, 2026.
Posted Date
-
Due Date
Feb 15, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 15, 2026
The City of University Place seeks qualified consultants to provide surveying services for the 67th Ave W Improvements Phase 3 project, spanning Cirque Dr W to 40th St W. Planned improvements include curb, curb ramps, gutters, landscaped pedestrian buffers, sidewalks, bicycle lanes, streetlights, an audible pedestrian signal at 67th and 44th, pavement markings, pedestrian/bicycle amenities, speed feedback signs, and median enhancements. The project schedule targets consultant agreement execution by December 15, 2025, with deliverables due by February 15, 2026.
AvailableInstall approx. 1,550 LF of new 10" and 12" diameter storm sewer pipe system. The new storm system includes a water quality filter cartridge vault, eight new manholes, and eleven new catch basins; decommissioning of the existing underground injection control (UIC) system; and connection to the existing downstream storm system. Other major work includes new valley gutters, full-depth road rehabilitation along Redfern Avenue, and an asphalt drainage curb along Haven Street.
Posted Date
Dec 19, 2025
Due Date
Jan 28, 2026
Release: Dec 19, 2025
Close: Jan 28, 2026
Install approx. 1,550 LF of new 10" and 12" diameter storm sewer pipe system. The new storm system includes a water quality filter cartridge vault, eight new manholes, and eleven new catch basins; decommissioning of the existing underground injection control (UIC) system; and connection to the existing downstream storm system. Other major work includes new valley gutters, full-depth road rehabilitation along Redfern Avenue, and an asphalt drainage curb along Haven Street.
AvailableThe Oregon Department of Transportation (ODOT) is soliciting quotes for planning services for project K23252 SW Allen Blvd: SW Murray Blvd - SW King Ave. The procurement is being conducted via ODOT's Master Blanket Selection Process (BVA/RFQ) and requires standard quote attachments such as a cover sheet, key staff resumes, and project samples. The solicitation was made available on 2026-01-09 and has a bid opening (submission deadline) on 2026-01-30, so it was open/active as of 2026-01-13.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Close: Jan 30, 2026
The Oregon Department of Transportation (ODOT) is soliciting quotes for planning services for project K23252 SW Allen Blvd: SW Murray Blvd - SW King Ave. The procurement is being conducted via ODOT's Master Blanket Selection Process (BVA/RFQ) and requires standard quote attachments such as a cover sheet, key staff resumes, and project samples. The solicitation was made available on 2026-01-09 and has a bid opening (submission deadline) on 2026-01-30, so it was open/active as of 2026-01-13.
AvailableConstruct street and drainage improvements.
Posted Date
Jan 13, 2026
Due Date
Feb 3, 2026
Release: Jan 13, 2026
Close: Feb 3, 2026
Construct street and drainage improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →