Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Oregon Department of Transportation (ODOT) is soliciting quotes for planning services for project K23252 SW Allen Blvd: SW Murray Blvd - SW King Ave. The procurement is being conducted via ODOT's Master Blanket Selection Process (BVA/RFQ) and requires standard quote attachments such as a cover sheet, key staff resumes, and project samples. The solicitation was made available on 2026-01-09 and has a bid opening (submission deadline) on 2026-01-30, so it was open/active as of 2026-01-13.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 15,00 SF temporary signs (00222); 6 EA portable changeable message signs (00222); 20 EA temporary sign supports (00222); 8 EA flagger station lighting (00223); 565 EA temporary plastic drums (00224); 30 EA temporary barricades, type ii (00224); 50 EA temporary barricades, type iii (00224); 5,400 EA temporary reflective pavement markers (00225); 27,000 LF temporary striping (00225); 16 EA temporary pavement legends (00225); 112 SF temporary pavement bars (00225); 16 EA legend removal (00225); 112 SF bar removal (00225); 4 EA repair temporary impact attenuator, sand barrel system (00226). See outside link.
Posted Date
Jan 12, 2026
Due Date
Feb 4, 2026
Release: Jan 12, 2026
Close: Feb 4, 2026
Work includes 15,00 SF temporary signs (00222); 6 EA portable changeable message signs (00222); 20 EA temporary sign supports (00222); 8 EA flagger station lighting (00223); 565 EA temporary plastic drums (00224); 30 EA temporary barricades, type ii (00224); 50 EA temporary barricades, type iii (00224); 5,400 EA temporary reflective pavement markers (00225); 27,000 LF temporary striping (00225); 16 EA temporary pavement legends (00225); 112 SF temporary pavement bars (00225); 16 EA legend removal (00225); 112 SF bar removal (00225); 4 EA repair temporary impact attenuator, sand barrel system (00226). See outside link.
AvailablePurchase of Purchase Property Parcel #0250006700 - 6935 Clearport Rd SW.
Posted Date
Jan 17, 2026
Due Date
Feb 17, 2026
Release: Jan 17, 2026
Close: Feb 17, 2026
Purchase of Purchase Property Parcel #0250006700 - 6935 Clearport Rd SW.
AvailableProject is approx 4,161 LF of 2" PVC & 1,990 LF of 6" DIP waterlines.
Posted Date
Jan 10, 2026
Due Date
Jan 27, 2026
Release: Jan 10, 2026
Close: Jan 27, 2026
Project is approx 4,161 LF of 2" PVC & 1,990 LF of 6" DIP waterlines.
AvailableConstruct 3rd Avenue SW Reconstruction project including all labor, materials, and equipment necessary for clearing and grubbing; removal and installation of PCC curb and gutter, PCC sidewalk and driveways, 7″ PCC Pavement, HMA wedge and driveways; removal of existing pipe and structures; abandonment of sanitary sewer and water main; installation of PVC sanitary sewer (8″-10″) and manholes, RCP storm sewer (12″-36″), RCAP storm sewer, storm intakes, subdrain, PVC water main (4″-8″), DIP water main (8″), hydrants, valves; traffic control; erosion control; SWPPP preparation and management; seeding; testing; and miscellaneous associated work including cleanup.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Construct 3rd Avenue SW Reconstruction project including all labor, materials, and equipment necessary for clearing and grubbing; removal and installation of PCC curb and gutter, PCC sidewalk and driveways, 7″ PCC Pavement, HMA wedge and driveways; removal of existing pipe and structures; abandonment of sanitary sewer and water main; installation of PVC sanitary sewer (8″-10″) and manholes, RCP storm sewer (12″-36″), RCAP storm sewer, storm intakes, subdrain, PVC water main (4″-8″), DIP water main (8″), hydrants, valves; traffic control; erosion control; SWPPP preparation and management; seeding; testing; and miscellaneous associated work including cleanup.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis