Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project is approx 4,161 LF of 2" PVC & 1,990 LF of 6" DIP waterlines.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Oregon Department of Transportation (ODOT) is soliciting quotes for planning services for project K23252 SW Allen Blvd: SW Murray Blvd - SW King Ave. The procurement is being conducted via ODOT's Master Blanket Selection Process (BVA/RFQ) and requires standard quote attachments such as a cover sheet, key staff resumes, and project samples. The solicitation was made available on 2026-01-09 and has a bid opening (submission deadline) on 2026-01-30, so it was open/active as of 2026-01-13.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Oregon Department of Transportation (ODOT) is soliciting quotes for planning services for project K23252 SW Allen Blvd: SW Murray Blvd - SW King Ave. The procurement is being conducted via ODOT's Master Blanket Selection Process (BVA/RFQ) and requires standard quote attachments such as a cover sheet, key staff resumes, and project samples. The solicitation was made available on 2026-01-09 and has a bid opening (submission deadline) on 2026-01-30, so it was open/active as of 2026-01-13.
AvailableThis Invitation for Bid is for the replacement of a waterline along 400 N Main St to 200 W.
Posted Date
-
Due Date
Feb 19, 2026
Close: Feb 19, 2026
This Invitation for Bid is for the replacement of a waterline along 400 N Main St to 200 W.
AvailableReplacement of the parking lot & tunnel cap, implementation of a sump pump system, replacement of utility lines, repairing the structural integrity of the tunnel walls, and relocation of tunnel access hatches for the Main Building to the SW Wing underground tunnel at the Clarinda Correctional Facility.
Posted Date
Jan 12, 2026
Due Date
Feb 10, 2026
Release: Jan 12, 2026
Close: Feb 10, 2026
Replacement of the parking lot & tunnel cap, implementation of a sump pump system, replacement of utility lines, repairing the structural integrity of the tunnel walls, and relocation of tunnel access hatches for the Main Building to the SW Wing underground tunnel at the Clarinda Correctional Facility.
AvailableWork includes construction of approx 1,503 LF 12" water main as well as horizontal directional bore of the 12" waterline under the Vermilion River, hydrant replacements, side street reconnections, water service reconnections and in-place abandonment of the existing water main. Driveway and roadway pavements disturbed will be replaced in-kind, and all disturbed tree lawns will be regraded and seeded.
Posted Date
Jan 30, 2025
Due Date
Jan 29, 2026
Release: Jan 30, 2025
Close: Jan 29, 2026
Work includes construction of approx 1,503 LF 12" water main as well as horizontal directional bore of the 12" waterline under the Vermilion River, hydrant replacements, side street reconnections, water service reconnections and in-place abandonment of the existing water main. Driveway and roadway pavements disturbed will be replaced in-kind, and all disturbed tree lawns will be regraded and seeded.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →