13200 South Mountain View Corridor Sewer Project
The project includes the installation of 121 LF of 10" and 794 LF of 18" PVC gravity sanitary sewer pipe, along with a trenchless installation of a 36" steel casing containing a carrier pipe passing beneath the state route corridor. Construction requires the excavation, construction, and backfilling of launch, retrieval, and intermediate shafts, alongside the installation of new 60" lined sanitary sewer manholes and connecting into the existing sewer infrastructure. Additional work encompasses sewer bypass pumping, abandonment and removal of existing sewer lines, surface and pavement restoration (including curb, gutter, sidewalk, and striping), and traffic control within the state right-of-way.