Triple Crown Subdivision Concrete Replacement (30" Curb, Sidewalks, and ADA Ramps)
Aug 13, 2026
Closes
Aug 27, 2026
Work consist of 7,000 lf of 30" concrete curb replacement, 300 sy of sidewalk replacement, 250 sy of ada ramp installation, removal and disposal of existing curb and gutter, installation of 30-inch concrete curb and gutter, protection and curing of concrete, saw cutting existing pavement, removal and disposal of existing sidewalk, placement of new concrete sidewalk, installation of expansion joints and contraction joints, restoration of adjacent turf, landscaping, and disturbed areas, 4" concrete sidewalk, 6" concrete sidewalk. See attached file.
