CityCA
Posted
Aug 18, 2026
Oct 1, 2026
Chilled Water System Upgrade
Seeking proposal for chilled water system upgrade.
Description: Chilled water plant upgrade.
HigherEducation · OH, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
CityCA
Posted
Aug 18, 2026
Oct 1, 2026
Seeking proposal for chilled water system upgrade.
CityOR
Posted
Aug 24, 2026
Sep 22, 2026
The scope of work generally consists of retrofitting the existing water treatment facility with membrane filtration technology. The general contractor's work includes installation of three 1.3 MGD pre-purchased membrane skids and support equipment, and pre-purchased automatic transfer switch, staged demolition of the existing 2 MGD rapid sand filters and support equipment, construction of new partitions within the existing building to provide an office/lab, new electrical room, and new bathroom/locker facilities, new vehicle access door, and installation of multiple pumps and instrumentation. Site work includes renovation of an existing 75,000 gallon welded steel reservoir, installation of a pre-manufactured sewage grinder pump station with 700 feet of 1¼" force main, construction of two concrete backwash basins, and paving the access road to the plant.
CountyMD
Posted
Aug 5, 2026
Sep 16, 2026
Harford County's Department of Public Works—Water and Sewer is soliciting bids for removal and replacement of the existing Soda Ash System processing equipment and associated loop piping at the Abingdon Water Treatment Plant. The open IFB was posted on August 5, 2026, and bids are due September 16, 2026, at 1:00 PM EDT. This is a local government construction procurement for a water-treatment upgrade, not a grant program.
Posted
Aug 24, 2026
Oct 23, 2026
USACE New England District is soliciting full-and-open proposals for construction of a chilled water plant and site utility upgrades at the VA Medical Center in West Haven, Connecticut; this is a federal construction solicitation, not a grant program. The work includes demolishing the existing chilled water plant, constructing a new multi-story plant with chillers, cooling towers, pumps, electrical and mechanical systems, building a new fuel tank farm and water storage tanks, and installing upgraded chilled-water, steam, condensate, domestic-water, fire-protection, and electrical utility systems. The project must be coordinated around an active medical campus, meet applicable physical-security and LEED Silver requirements, and proposals are due October 23, 2026, at 1:00 p.m. EDT.
Decision makers connected to this RFP from Northeast Ohio Medical University.