Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal and replacement of 16" check valve & spool for pump #4 a
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
1 EA 16" check valve designed to prevent backflow in potable piping systems.
Posted Date
Jan 20, 2026
Due Date
Jan 27, 2026
Release: Jan 20, 2026
Close: Jan 27, 2026
1 EA 16" check valve designed to prevent backflow in potable piping systems.
AvailableWork includes remove 5 existing 16 pump control valves; existing valves are a combination of singer and bailey valves; remove 1 existing size 8 altitude valve; existing altitude valve is bailey; properly dispose of all debris off-site in accordance with local regulations; valves must be installed as they are removed; once one valve is removed, one valve is to be installed to limit the amount of operational impact; install 5 new identical pump control valves; other comparable valves may be accepted but cla-val 60-bt with high capacity csm 11 h-c is preferred; install 1 new replacement altitude valve. Installation must be done the same day as removal and must be coordinated 2 weeks in advance. See attached file.
Posted Date
Dec 31, 2025
Due Date
Feb 5, 2026
Release: Dec 31, 2025
Close: Feb 5, 2026
Work includes remove 5 existing 16 pump control valves; existing valves are a combination of singer and bailey valves; remove 1 existing size 8 altitude valve; existing altitude valve is bailey; properly dispose of all debris off-site in accordance with local regulations; valves must be installed as they are removed; once one valve is removed, one valve is to be installed to limit the amount of operational impact; install 5 new identical pump control valves; other comparable valves may be accepted but cla-val 60-bt with high capacity csm 11 h-c is preferred; install 1 new replacement altitude valve. Installation must be done the same day as removal and must be coordinated 2 weeks in advance. See attached file.
AvailableRelease: Jan 14, 2026
Close: Jan 29, 2026
Sensus usa inc sole source notice.
AvailableProvide valve assembly, manifold,(NSN): 4820014157409 for additional quantities: 5, Delivery schedule: 835 Days
Posted Date
Dec 17, 2025
Due Date
Mar 2, 2026
Release: Dec 17, 2025
Close: Mar 2, 2026
Provide valve assembly, manifold,(NSN): 4820014157409 for additional quantities: 5, Delivery schedule: 835 Days
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →