Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of the renovations of the CFSB Center lower bowl seating replacement and creation of premium seating and club space options.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The lower seating repairs occur between stadium gate 1 and gate 4. The work focuses on the precast concrete seating units at row 1 through row 51 in section 1 through section 11. Repairs include removal and replacement of the waterproofing membrane and all sealants at the precast seating units. Rewelding and repairs of steel connections between precast seating units, repairs at rails, and installation of supplemental steel brackets. Repair of concrete deterioration at the precast seating units and support framing. Installation of new drains at the lower row and repairs at existing drains. Preparation and painting of steel framing, support members, and concrete wall panels. The existing bleacher-style seats will be temporarily removed and reinstalled upon completion of the work in the lower seating.
Posted Date
-
Due Date
Dec 16, 2025
Premium
Access the largest public sector contact database
Close: Dec 16, 2025
The lower seating repairs occur between stadium gate 1 and gate 4. The work focuses on the precast concrete seating units at row 1 through row 51 in section 1 through section 11. Repairs include removal and replacement of the waterproofing membrane and all sealants at the precast seating units. Rewelding and repairs of steel connections between precast seating units, repairs at rails, and installation of supplemental steel brackets. Repair of concrete deterioration at the precast seating units and support framing. Installation of new drains at the lower row and repairs at existing drains. Preparation and painting of steel framing, support members, and concrete wall panels. The existing bleacher-style seats will be temporarily removed and reinstalled upon completion of the work in the lower seating.
AvailableWork include construction of premium seating and press area. The new premium seating will consist of four (4) loge suites, four (4) loge seating areas and two (2) ledge seating areas. The loge suites and seating areas will have millwork, refrigerators, tablets, power, data and furniture. The ledge seats will have a counter, tablets, power, data and furniture. Press area will consist of thirty-four (34) press seats with a counter and dual power and usb outlets per seat. The press area will also consist of one (1) ada seating area.
Posted Date
-
Due Date
Dec 15, 2025
Release: -
Close: Dec 15, 2025
Work include construction of premium seating and press area. The new premium seating will consist of four (4) loge suites, four (4) loge seating areas and two (2) ledge seating areas. The loge suites and seating areas will have millwork, refrigerators, tablets, power, data and furniture. The ledge seats will have a counter, tablets, power, data and furniture. Press area will consist of thirty-four (34) press seats with a counter and dual power and usb outlets per seat. The press area will also consist of one (1) ada seating area.
AvailableWork include construction of premium seating and press area. The new premium seating will consist of four (4) loge suites, four (4) loge seating areas and two (2) ledge seating areas. The loge suites and seating areas will have millwork, refrigerators, tablets, power, data and furniture. The ledge seats will have a counter, tablets, power, data and furniture. Press area will consist of thirty-four (34) press seats with a counter and dual power and usb outlets per seat. The press area will also consist of one (1) ada seating area.
Posted Date
-
Due Date
Dec 15, 2025
Release: -
Close: Dec 15, 2025
Work include construction of premium seating and press area. The new premium seating will consist of four (4) loge suites, four (4) loge seating areas and two (2) ledge seating areas. The loge suites and seating areas will have millwork, refrigerators, tablets, power, data and furniture. The ledge seats will have a counter, tablets, power, data and furniture. Press area will consist of thirty-four (34) press seats with a counter and dual power and usb outlets per seat. The press area will also consist of one (1) ada seating area.
AvailableRelease: Nov 27, 2025
Close: Dec 12, 2025
222 ea, bowl, sediment, NSN: 2910013641630.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis