CityFL
Posted
Jul 20, 2026
Sep 10, 2026
Johnson Street Bridge Replacement and Public Utilities Relocation
Work includes maintenance of traffic 1 ls, bedding 7 cy, regular excavation and backfill 130 cy, riprap- rubble, remove existing and reinstall (general canal restoration) 40cy, utility pipe,remove & dispose, 8-19. 9" 463 lf, utility pipe, remove & dispose, 20-49.9" (ex. north 20" dip brine = 25') 25 lf. See outside link.