Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking a qualified consulting firm or team to provide complete design services. The center street improvements project will enhance mobility and accessibility for pedestrians and cyclists between main street and university drive and the surrounding downtown area. The project will create a gateway into downtown, a sense of arrival, and a connection from the convention center to downtown business. Building on the previously completed design concept report (dcr) for center street (mckellips road to broadway road), this project focuses on implementing a cohesive complete streets design. The center street corridor is part of mesa’s downtown core with the existing roadway consisting of a four- lane collector with on-street parking, surrounded by city center land use. The selected firm will develop detailed design plans, specifications, and cost estimates for the following: redesign of center street lanes to prioritize multimodal access; wider sidewalks to enhance pedestrian accessibility and comfort; shade elements; separated bike lanes; traffic calming feature to improve traffic flow, and safety, will also accommodate large vehicles and downtown events; integration with adjacent multimodal infrastructure and community facilities, including the downtown sidewalk network, light rail, transit services, asu facilities, and city administration buildings; maximize on-street parking by implementing elements of the downtown micromobility and parking study the project scope may ultimately include the preparation of multiple studies, reports, conceptual designs, cost estimates, construction bid documents, or other similar project deliverables
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Request for Qualifications for engineering services related to the design and construction management of a street and drainage improvement project for the City of Culloden.
Posted Date
Jan 7, 2026
Due Date
Feb 9, 2026
Release: Jan 7, 2026
Close: Feb 9, 2026
Request for Qualifications for engineering services related to the design and construction management of a street and drainage improvement project for the City of Culloden.
AvailableSeeking an experienced Construction Manager/General Contractor (CM/GC) to provide preconstruction services for the Main Street Improvements—the first phase of Project Downtown. The CM/GC will bring expertise in construction management, cost estimating, scheduling, constructability review, risk assessment, value engineering, permitting coordination, and stakeholder engagement.
Posted Date
Dec 22, 2025
Due Date
Feb 4, 2026
Release: Dec 22, 2025
Close: Feb 4, 2026
Seeking an experienced Construction Manager/General Contractor (CM/GC) to provide preconstruction services for the Main Street Improvements—the first phase of Project Downtown. The CM/GC will bring expertise in construction management, cost estimating, scheduling, constructability review, risk assessment, value engineering, permitting coordination, and stakeholder engagement.
The City of Chattanooga (TN) issued an RFQ seeking consulting/engineering services to manage and deliver Quick-Build street improvements on Broad Street, including project management, NEPA environmental documentation, surveying, plans, cost estimates, permits, ROW/utility/rail coordination, and pre-construction deliverables. The RFQ was posted on 2026-01-05 and proposals are due on 2026-01-30. The solicitation is a procurement RFQ (not a grant) and the original posting is on the City of Chattanooga procurement portal (Oracle Cloud).
Posted Date
Jan 5, 2026
Due Date
Jan 30, 2026
Release: Jan 5, 2026
Close: Jan 30, 2026
The City of Chattanooga (TN) issued an RFQ seeking consulting/engineering services to manage and deliver Quick-Build street improvements on Broad Street, including project management, NEPA environmental documentation, surveying, plans, cost estimates, permits, ROW/utility/rail coordination, and pre-construction deliverables. The RFQ was posted on 2026-01-05 and proposals are due on 2026-01-30. The solicitation is a procurement RFQ (not a grant) and the original posting is on the City of Chattanooga procurement portal (Oracle Cloud).
The County of Fairfax requests Statements of Qualifications from qualified engineering firms for the Magnolia Lane Capacity Improvements Project, covering planning, design, permitting, and construction-phase support to upsize approximately 3,492 linear feet of existing 8-inch and 10-inch gravity sewer to new 12-inch and 16-inch pipes. The procurement is managed through the county's Wastewater Design and Construction Division and seeks firms to support the project from planning through construction-phase services.
Posted Date
Nov 17, 2025
Due Date
Jan 20, 2026
Release: Nov 17, 2025
Close: Jan 20, 2026
The County of Fairfax requests Statements of Qualifications from qualified engineering firms for the Magnolia Lane Capacity Improvements Project, covering planning, design, permitting, and construction-phase support to upsize approximately 3,492 linear feet of existing 8-inch and 10-inch gravity sewer to new 12-inch and 16-inch pipes. The procurement is managed through the county's Wastewater Design and Construction Division and seeks firms to support the project from planning through construction-phase services.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis