CityOR
Posted
Oct 9, 2026
Oct 20, 2026
May Street Elevated Sidewalk Catch Basin Replacement RFP
The work generally consists of replacement of an existing catch basin and associated storm drainage improvements beneath and adjacent to the elevated sidewalk. Work includes excavation; installation of a new catch basin, manhole, storm drain piping, and associated drainage improvements; controlled density fill(CDF) backfill; temporary shoring and protection of existing improvements; pavement and surface restoration; and other related work.
