CityFL
Posted
Nov 15, 2026
Jan 15, 2027
Minutemen Shoreline Stabilization PH1 RFP
Project location: • Project Area 1: Shoreline between Deleon Road and Chipola Road • Project Area 2: Shoreline between Boca Ciega Road and Aucila Road • Project Area 3: Shoreline between Aucila Road and Sunset Drive stabilization improvements along three (3) sections of the Minutemen Causeway canal shoreline. The project is intended to stabilize eroding shoreline areas, protect adjacent public infrastructure, improve stormwater outfalls, and enhance t Summary of work: The City of Cocoa Beach is soliciting bids from qualified contractors to construct shoreline he long-term resilience of the City's waterfront assets. The project consists of the construction of vinyl sheet-pile seawalls with reinforced concrete caps at the above-mentioned locations
