CountyFL
Posted
Oct 21, 2026
Dec 2, 2026
Live Oak Point - Shoreline Stabilization RFP
Shoreline stabilization project, including the installation of sheet piling within three designated areas. These are disaster recovery project(s) due to Hurricane Ian (DR-4673-FL), Hurricane Idalia (DR-4734-FL), and Hurricane Milton (DR-4834-FL).
