CityTX
Posted
Nov 18, 2026
Dec 10, 2026
Generator Installation RFP
Work includes generator installation.
Description: The City of Santa Ana is seeking proposals for design-build services to install a new emergency backup system at Carnegie Center, also known as the Navigation Center. The RFP requires contractors to have at least five continuous years in business and three recent years of comparable experience, along with a valid California C-10 contractor license. Proposers must submit the most recent valid CARB Certificates of Reported Compliance for themselves and their listed subcontractors.
City · CA, US
Adjacent opportunities open for bidding right now.
CityTX
Posted
Nov 18, 2026
Dec 10, 2026
Work includes generator installation.
Louisiana Division of Administration
State AgencyLA
Posted
Nov 17, 2026
Dec 10, 2026
Seeking contractor shall supply all labor, equipment, and materials to install four standby generator systems complete with four automatic transfer switches for the louisiana department of health (ldh).
North Dakota Mill and Elevator Association
State AgencyND
Posted
Nov 6, 2026
Dec 3, 2026
Project includes Phase 1: The final installation of an owner provided 2250 kW, 2813 kVA, 480Y/277V Cummins diesel generator and sub-base fuel tank and an owner provided 2500 kVA step-up transformer, 480Y/277V to 4160V Delta. The project would include all conduit, conductors, and control conductors for a complete generator installation for automatic peak reduction as needed. The generator, sub-base fuel tank and an owner provided transformer have been installed in a previous project, but the conductor installation and final programming has not been completed. Phase 2: The installation of an owner provided 2250 kW, 2813 kVA, 480Y/277V Cummins diesel generator and sub-base fuel tank and an owner provided 2500 kVA step-up transformer, 480Y/277V to 4160V Delta. The project would include all conduit, conductors, and control conductors for a complete generator installation for automatic peak reduction as needed. The concrete pad for the generator and transformer shall be included by the electrical contractor for the Phase 2 portion of the project.
CountyFL
Posted
Oct 29, 2026
Dec 2, 2026
The installation of the generator listed above includes, but not be limited to, the following: * complete a detailed survey of the installation site * complete all design services necessary to obtain required permits * remove fuel from existing generator subbase fuel tank and clean tank for disposal * remove existing generator and subbase tank and properly dispose of offsite * set provided 80kw generator on existing elevated concrete pad * provide and install two sets of osha compliant walkways * two (2) sets of osha compliant stairs with railings and 120" long x 36" wide walkway with railings * railings to be constructed of 1 1/2" aluminum tube.
Decision makers connected to this RFP from City of Santa Ana.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
244 days before RFP
Staff presented the Santa Ana Navigation Center capital-improvement project as included in the Community Development Commission's unanimously approved recommendation of the annual action plan and budget, with a stand-alone backup generator.
So, we have capital improvement projects such as the Santa Ana Navigation Center. Um and this project is where they'll be receiving a stand-alone uh backup generator. The generator will provide emergency electrical power during uh rolling blackouts and other power interruptions that the community uh commonly occurs during the summer months. Do any of you…
Community Development Commission Regular Meeting
Board meeting · Mar 25, 2026
Capital improvement plan
175 days before RFP
The adopted FY2026-27 CIP included the Santa Ana Homeless Shelter Generator Improvements project, with $300,000 in FY2026-27 construction funding from CDBG Programs.
PROJECT CATEGORY: CITY AND PARK FACILITY IMPROVEMENTS Project Title Adopted FY2026-27 Planned Projects Years 2-7 Alton Bike Trail & Security Cameras $600,000 - Cabrillo Park Restrooms $650,000 - Delhi Library ADA Improvements $100,000 - Edna Park Shade Structure $250,000 - Logan/Chepa's Park Construction $1,000,000 - Santa Ana Homeless Shelter Generator…
RFP published
Proposals due (25 days left)
City of Santa Ana Capital Improvement Program 2026-2032
Capital improvement plan · Jun 2, 2026