Description: The work includes the existing vocation program building serving the District's Career and Technical Education program, consisting of the renovation and modernization of this building so that it continues to serve the program alongside the new high school, with a scope anticipating selective demolition and abatement coordination, structural modifications, concrete foundations and slabs on grade, exterior envelope work including brick veneer and aluminum storefronts, roofing and roof-mounted mechanical equipment, interior fit-out of shops and labs, new mechanical and plumbing systems, new electrical distribution including an 800A service and panelboards, and associated site, utility, and earthwork.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
MBMichelle BrandonAdministrative Assistant to Associate Superintendent for Instructional Support
*******@************
+1 (***) ***-****
RFP documents & timeline
From the first pre-RFP signals to the published RFP and its files.
Board meeting
167 days before RFP
The District recorded that Phase III G Building renovation design was advancing toward 60% documents and stakeholder review.
See sourceHide source
• CCHS Update - Phase 1 - Site Demo/Temp Parking - anticipate the temporary lot to be open May 4, will be communicating the changes for traffic, bussing, parking, and parent pick up/drop off will be posted on the District and CCHS websites, Remind messages to families, building announcements, plan will be shared with visiting schools as they travel to CCHS…
Campbell County School District Board Of Trustees Regular Meeting
The Board approved the Phase II construction contract and funding for design, additional services, and contingency for non-qualified elements in Phases II and III of the CCHS replacement project.
See sourceHide source
Campbell County High School Phase 2 Construction, Design Fees & Services for Non-Qualified Elements Mr. Bartlett provided information for the Campbell County High School Phase 2 Construction, Design Fees and Services for Non-Qualified Elements and asked the Board to approve a motion to award a construction contract for Phase II of the Campbell County High…
Campbell County School District Board Of Trustees Regular Meeting
The District gave notice to proceed to 100% design for Phase III G Building, with renovation targeted for March 15, 2027 through October 15, 2027.
See sourceHide source
Facility Update Mr. Bartlett provided a facility update on the following: • Summer Projects -- all approved summer major maintenance projects have been completed with the exception of two small playground components at Rawhide and Stocktrail which are anticipated to be installed by October; the switch gear project at ESC has been moved to next summer based…
Campbell County School District Board Of Trustees Regular Meeting
The District recorded submission of Phase III G Building 100% design documents and a six-week bid-preparation period for three pre-qualified contractors.
See sourceHide source
• Campbell County High School Replacement - Phase II Stadium/Bus Loop-Interior CMU load-bearing wall for first level are complete, asphalt paving on track is complete, earthwork/base prep for site concrete is in progress, Musco light pole bases are installed/light assembly and installation has begun, structural steel construction for pavilion is in…
Campbell County School District Board of Trustees Regular Meeting
The work includes the existing vocation program building serving the District's Career and Technical Education program, consisting of the renovation and modernization of this building so that it continues to serve the program alongside the new high school, with a scope anticipating selective demolition and abatement coordination, structural modifications, concrete foundations and slabs on grade, exterior envelope work including brick veneer and aluminum storefronts, roofing and roof-mounted mechanical equipment, interior fit-out of shops and labs, new mechanical and plumbing systems, new electrical distribution including an 800A service and panelboards, and associated site, utility, and earthwork.
Fermi National Accelerator Laboratory is soliciting proposals to construct an addition to and renovate the existing Central Utility Building at Fermilab in Batavia, Illinois. The facility provides chilled water, hot water, low-conductivity water, and makeup water for laboratory buildings and systems, supporting comfort, process cooling, and utility requirements. The work is scheduled to begin in January 2028, with final completion targeted for September 28, 2029, within Fermilab’s accelerator shutdown window.
Provide central utility building addition and renovation construction. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. Demolition of existing piping, equipment, conduit, ductwork, and others as indicated in the drawings. Expand CUB for location of new chillers and increase in the chilled water capacity. See attached file.